TM 9--2815--247--34
0015 00--9
INTAKE AND EXHAUST VALVE AND METERING PUMP TIMING --
CONTINUED
0015 00
Test -- Continued
19. If valve and fuel metering pump timing are correct, re--adjust intake valve clearance on cylinders 6R and 6L to
0.010 inch (.25 mm) following steps 8 through 11 and 14 through 17.
20. Install timing hole plug (5) on fuel metering pump (6).
Figure 35
5
6
21. Apply a small amount of lubricant to 12 cap screws (1).
22. Install right and left bank access cover (3) and a new gasket (4) using six cap screws (1) and six flat washers (2).
23. Torque 12 cap screws (1) to 275--325 lb--in (31.1--36.7 NSm).
Figure 10
1
2
3
4
|
|
|
|