Custom Search
 
  
 
TM 9-2815-250-24&P 3-5. CYLINDER HEADS REPAIR (continued). 5. Install two push rods (2) in two guides (1).  Make sure each push rod (2) rests on a tappet (22). 6.   Place  two  cylinderheads  (6)  on  two  combustion chamber liners (9), making sure two gaskets (7) are in place. 7.   Install eight washers (3), five extended plain nuts (4), and three plain nuts (5) on eight studs (8).  Torque nuts to 40 ft-lb (55 Nom).  See diagram below for correct placement of extended plain nuts (4) and plain nuts (5). FOLLOW-ON TASKS: Install thermostatic switch (para 2-26). Install oil tube assemblies (para 2-19). Install fuel injectors (para 3-14). Install intake manifold (para 2-21). Install airflow deflectors(para 2-24). Install rocker arm assemblies (para 3-10). Install eyebolt (para 2-16). 3-19


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business