TM 9-2815-250-24&P
3-5.
CYLINDER HEADS REPAIR (continued).
5.
Install two push rods (2) in two guides (1). Make
sure each push rod (2) rests on a tappet (22).
6.
Place two cylinderheads (6) on two combustion
chamber liners (9), making sure two gaskets (7)
are in place.
7.
Install eight washers (3), five extended plain nuts (4), and three plain nuts (5) on eight studs (8). Torque nuts to
40 ft-lb (55 Nom). See diagram below for correct placement of extended plain nuts (4) and plain nuts (5).
FOLLOW-ON TASKS:
Install thermostatic switch (para 2-26).
Install oil tube assemblies (para 2-19).
Install fuel injectors (para 3-14).
Install intake manifold (para 2-21).
Install airflow deflectors(para 2-24).
Install rocker arm assemblies (para 3-10).
Install eyebolt (para 2-16).
3-19
|
|