Custom Search
 
  
 
ARMY TM 9-2815-255-24 AIR FORCE TO 38G1-95-2 MARINE CORPS TM 2815-24/4 FIGURE 3-38.  Oil Pressure Test Setup 3-22.  OIL BYPASS VALVE ASSEMBLY. 3-22.1.  Removal. a. Remove four bolts (1, FIGURE 3-34), two capscrews (2), and six lockwashers (3) from front of oil pan. b. Remove timing gear cover and front plate, refer to paragraphs 3-39.1.  and 3-43.1. c. Remove oil bypass valve and spring, refer to FIGURE 3-39. FIGURE 3-39.  Oil Bypass Valve Installation 3-22.2.  Inspect and Measure. a. Inspect valve and spring for damage. b. Using  a  spring  tester  apply  21  to  25  pounds  (92  to  112  N)  valve  spring.    Length  should  be  1.34  inches  (34 mm).Replace spring if not within specifications. 3-69


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business