ARMY TM 9-6115-666-13&P
AIR FORCE TO 35C2-3-505-1
SECTION III. OPERATION UNDER USUAL CONDITIONS
2.3. ASSEMBLY AND PREPARATION FOR USE.
2.3.1. Unpacking the Equipment. Unpacking must be performed by unit level maintenance personnel.
2.3.2. Installation Instructions.
2.3.2.1. Positioning Power Plant . Position the equipment at the worksite as follows:
WARNING
Trailer and towing vehicle must be on level ground to prevent accidental movement
resulting in injury to personnel.  Failure to observe this warning can result in severe
personal injury or death.
a. Select an area as level as possible to install equipment
b. Set the trailer handbrakes and lower the leveling jacks as shown in figure 2-3. Refer to TM 9-
2330-376-14&P for detailed installation of trailer.
c. Remove fire extinguishers from brackets. Locate on ground away from equipment.
Figure 2-3. Power Plant Installation
2-27


 