| Tweet | 
|   
    Custom Search
   | 
 | 
|   | ||
|  ARMY TM 9-6115-666-13&P AIR FORCE TO 35C2-3-505-1 4.14. SWITCH BOX CIRCUIT BREAKER/SWITCH MAINTENANCE (Continued). Figure 4-9. Circuit Breaker/Switch Replacement TEST 1. Set multimeter to continuity test. 3. Replace circuit breaker(s) (2) or switch (4) that do not pass continuity in step 2. Table 4-4. Circuit Breaker/Switch Continuity CONTINUITY NO CONTINUITY (ON Position) (OFF Position) 1-2 1-2 3-4 3-4 5-6 5-6 4-22 | ||
|  | ||