Tweet |
Custom Search
|
|
|
||
ARMY TM 9-6115-666-13&P
AIR FORCE TO 35C2-3-505-1
4.14. SWITCH BOX CIRCUIT BREAKER/SWITCH MAINTENANCE (Continued).
Figure 4-9. Circuit Breaker/Switch Replacement
TEST
1. Set multimeter to continuity test.
3. Replace circuit breaker(s) (2) or switch (4) that do not pass continuity in step 2.
Table 4-4. Circuit Breaker/Switch Continuity
CONTINUITY
NO CONTINUITY
(ON Position)
(OFF Position)
1-2
1-2
3-4
3-4
5-6
5-6
4-22
|
||