Custom Search
 
  
 
ARMY TM 9-6115-666-13&P
AIR FORCE TO 35C2-3-505-1
5.8. ELECTRICAL LEADS MAINTENANCE
This task covers:
a. Inspection
d. Repair
b. Removal
e. Installation
c. Test
INITIAL SETUP:
Tools
Equipment Conditions
Tool Kit, General Mechanic's
Reference
(item 1, appendix B)
Both generator sets shut down, paragraph 2.7.1
Crimp Tool (item 4)
Multimeter, AN/PSM-45 (item 2, appendix B)
INSPECTION
Visually inspect leads for loose, broken, or corroded connections.
REMOVAL
1. Release strap securing top cover on switch box and remove switch box cover.
2. Remove six screws securing two clear plastic panel covers.
3. Refer to table 5-1 and FO-1, tag each end of lead to be replaced.
4. Disconnect and remove lead.
TEST
2. Refer to FO-1 and table 5-1 and check continuity of electrical leads.
REPAIR
Refer to appendix H and repair or manufacture lead.
5-12


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business