ARMY TM 9-6115-666-13&P
AIR FORCE TO 35C2-3-505-1
5.10. CABLE ASSEMBLY MAINTENANCE.
This task covers:
a. Inspection
c. Repair
b. Removal
d. Installation
INITIAL SETUP:
Tools
Equipment Conditions
Tool Kit, General Mechanic's
Reference
(item 1, appendix B)
Both generator sets shut down, paragraph 2.7.1
Crimp Tool (item 4)
Switch box cover removed.
Two clear plastic panel covers removed.
INSPECTION
Visually inspect leads for loose, broken, or corroded connections.
REMOVAL
2. Disconnect cable assembly (1, figure 5-6) from generator terminals (2) and pull cable through power
cable sock (14) on generator set (15).
3. Loosen stuffing tube (3).
4. Remove lock nuts (4), lock washers (5), and flat washers (6) securing cable terminal ends (7) to input
switch (8).
5. Remove lock nuts (9), flat washers (10), and screws (1 1) securing terminal ends (12) to bus bar (13)
and pull cable assembly through stuffing tube..
5-18
|
||