5.9. WIRING HARNESS MAINTENANCE
This task covers:
a. Inspection
d. Repair
b. Removal
e. Installation
c. Test
INITIAL SETUP:
Tools
Equipment Conditions
Toot Kit, General Mechanic's
Reference
(item 1, appendix B)
Both generator sets shut down, paragraph 2.7.1
Crimp Too] (item 4)
Switch box cover removed, paragraph 4.11
Multimeter, AN/PSM-45, (item 2, appendix B)
Two clear plastic panel covers removed,
INSPECTION
Visually inspect leads for loose, broken, or corroded connections.
REMOVAL
1. Refer to FO-1, and tag each lead of the wiring harness to be replaced.
2. Remove four self-locking nuts (1, figure 5-5), flat washers (2), and screws (3) securing wiring harness
(4) to switch box.
3. Remove nuts (5), lock washers (6), flat washers (7), and screws (8) securing terminal lugs (9) to bus
bar assembly.
4. Remove wire harness from switch box.