TM9-2815-202-34
5-2. TURBOCHARGER REMOVAL/lNSTALLATION (Cont)
b. Cleanlng/inspection
(1) Inspect hoses for cuts, cracks, and
brittleness.
(2) Replace all parts failing inspection.
.
c. Installation
(1)
(2)
(3)
(4)
(5)
Install gasket (9) over studs (10) on
exhaust manifold (8).
Install turbocharger (4) over studs
(10); secure with four washers (7) and
four locking nuts (6). Torque locking
nuts to 35-39 Ib-ft (47-53 N-m).
Slide two hoses (2) and four clamps
(1) onto air inlet tube (3).
Position air inlet tube (3) between
turbocharger (4) and air inlet housing
(5).
Slide hoses (2) and clamps (1) onto
turbocharger (4) and air inlet housing
(5). Tighten hose clamps.
END OF TASK
FOLLOW-ON MAINTENANCE
Para Description
3-14 Install air inlet manifold
3-12 Install turbocharger oil supply line
3-10 Install turbocharger oil return line
3-8
Install starter
5-4
|
|