Custom Search
 
  
 
TM9-2815-202-34 e. Test/Adjustment (1) (2) (3) (4) (5) (6) Connect end of hose (8) to inlet port and hose (6) to outlet port of pump. Attach a 24 V dc power source to pump and motor assembly (2). After pump is primed and fuel flow established, flow with no restrictions is 0.2 GPM. Connect a pressure gage and cutoff valve to hose (6) and power up pump. Pressure with outlet shut off must be 40 PSI minimum. Connect a vacuum gage and cutoff valve to hose (8) and power up pump. Suction with inlet shut off must be 18 inches of mercury minimum. Disconnect 24 V dc power source. Remove gages, valves, and hoses (6 and 8) from pump and motor assembly (2). 6-17


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business