(2)
(3)
TM9-2815-202-34
Install gasket (24) and tube (21 ) onto block. Secure with two bolts (22), two Iockwashers
(19), and flat washer (23). Torque bolts to 30-35 Ib-ft (41 -47 N-m).
If removed, install clip (20) onto tube (21). Secure clip and tube on flywheel housing with bolt
(17), Iockwasher (19), and nut (18). Torque bolt to 30-35 Ib-ft (41-47 N-m).
END OF TASK
FOLLOW-ON MAINTENANCE
Para Description
6-14 Install air inlet housing
6-17. BLOWER DRIVE SHAFT AND HUB REPLACEMENT
(See Para 4-16)
6-18. GOVERNOR COVER AND THROTTLE CONTROL
(See Para 4-17)
ROD REMOVAL/lNSTALLATION
6-19. GOVERNOR AND BLOWER ASSEMBLY REMOVAL/lNSTALLATION (See Para 4-1 8)
6-20. BLOWER DRIVE GEAR AND SUPPORT REPLACEMENT
(See Para 4-19)
6-21. OIL PAN REPLACEMENT
(See Para 4-20)
6-22. CAMSHAFT FRONT GEAR COVER REPLACEMENT
(See Para 4-21)
6-23. FLYWHEEL ASSEMBLY REPLACEMENT
(See Para 4-22)
6-24. REAR OIL SEAL REPLACEMENT
(See Para 4-23)
6-25. FLYWHEEL HOUSING REPLACEMENT
(See Para 4-24)
6-26. IDLER GEAR REPLACEMENT
(See Para 4-25)
6-27. INJECTOR CONTROL TUBE REPLACEMENT
(See Para 4-26)
6-28. CYLINDER HEAD ASSEMBLY REMOVAL/lNSTALLATION
(See Para 4-27)
6-29. ENGINE LOWER FRONT COVER REPLACEMENT
(See Para 4-28)
6-30. CAMSHAFT AND GEAR ASSEMBLIES REPLACEMENT
(See Para 4-29)
6-31. CYLINDER BLOCK END PLATES REPLACEMENT
(See Para 4-30)
6-32. OIL PRESSURE REGULATOR AND RELIEF VALVE
REPLACEMENT
6-33. OIL PUMP REPLACEMENT
(See Para 4-31)
(See Para 4-32)
6-29
|
|