Custom Search
 
  
 
ARMY TM 9-6115-666-13&P
AIR FORCE TO 35C2-3-505-1
4.11. SWITCH BOX ASSEMBLY MAINTENANCE (Continued).
INSTALLATION
1. With the aid of a suitable lifting device position switch box assembly (9) on trailer.
2. Align mounting holes of the switch box with holes in trailer.
3. Install four screws (8), flat washers (7), and nuts (6) to secure the switch box assembly to the trailer.
4. Install ground cable (4) to the trailer ground terminal (5).
5. Refer to FO-1 and table 4-2 and table 4-3.
a. Connect power cable W1 (1) to generator set number 1.
b. Connect power cable W2 (2) to generator set number 2.
6. Install tie down straps connecting power cable W2 (2) to the paralleling cable.
Table 4-2. Cable Assembly W1.
Wire Color
From
To
BLUE
S1-LN5
L3
RED
S1-LN3
L2
BLACK
S1-LN1
L1
WHITE
W4-7(N)
N
GREEN
W5-1 1 (GND)
GND
Table 4-3. Cable Assembly W2.
Wire Color
From
To
BLUE
S2-LN5
L3
RED
S2-LN3
L2
BLACK
S2-LN1
L1
WHITE
W4-7(N)
N
GREEN
W5-12(GND)
GND
4-16


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business