Custom Search
 
  
 
T M 9 - 2 8 1 5 - 2 0 2 - 34 (13) (14) Install two gaskets (4) and two access covers (17) to oil four bolts (16) and four Iockwashers (2). Torque bolts to Install two preformed packings (15) and two gaskets (4) (15) (16) cooler assembly (5), securing with 30-35 Ib-ft (41-47 N-m). on flange (3). Install  valve  (12),  spring  (11),  and  retainer  (10)  into  oil cooler  bypass  (7).  Secure  retainer with screw (9). Tighten securely. Install oil cooler bypass (7), gasket (4), and tube (8) on oil cooler shell (5).  Secure with two bolts (1 and 6) and four Iockwashers (2). Torque bolts to 30-35 Ib-ft (41-47 N-m). END   OF   TASK FOLLOW-ON  MAINTENANCE Para   Description 3-6 Oil  Cooler  Installed 4 - 2 2 1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business