Custom Search
 
  
 
TM 9-2815-220-24
STARTER MOTOR REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP:
Tools:
Mandatory Replacement Parts (Continued):
General mechanic's tool kit (item 121, WP 0176)
Self locking nut (3) (item 31, WP 0175)
Open end wrench (item 113, WP 0176)
Lock washer (4) (Crankcase mounted LVPM
only) (item 86, WP 0175)
Expendable and Durable Items:
Personnel Required:
Adhesive, silicone rubber (item 3, WP 0173)
Track Vehicle Repairer (2) 63H10
Hardwood lumber blocks, as needed (item 20,
Equipment Conditions:
Tags, marker (item 39, WP 0173)
Engine removed from vehicle and placed on a
flat stationary surface
Mandatory Replacement Parts:
Gasket (item 304, WP 0175)
Self locking nut (2) (item 282, WP 0175)
NOTE
Tag all electrical connections and electrical leads prior to removal to
aid in installation. Large-gauge black wire (1), from starter
solenoid (2) to starter motor ground terminal (3), is part of starter
assembly and should not be removed (wire may not be routed exactly
as illustrated). Install nuts and lock washers on starter terminals
after removal of wires. New starters are supplied with new nuts and
lock washers for terminals.
2
3
1
WP 0049 00-1

 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business