Custom Search
 
  
 
ARMY TM 9-6115-666-13&P
AIR FORCE TO 35C2-3-505-1
4.15. SWITCH BOX ELECTRICAL LEAD MAINTENANCE.
This task covers:
a. Removal
c. Repair
b. Test
d. Installation
INITIAL SETUP :
Tools
Equipment Conditions
Tool Kit, General Mechanic's (item 1, appendix B)
Reference
Crimp Tool (item 4, appendix B)
Both generator sets shut down, paragraph 2.7.1
Multimeter, AN/PSM-45 (item 2, appendix B)
Trailer support devices are lowered
Switch box cover removed, paragraph 4.11.
Two clear plastic covers removed,
REMOVAL
Tag and disconnect electrical leads from power bus or circuit breaker/switch, refer to FO-1.
TEST
2. Refer to FO-1, and table 4-5 and check continuity of electrical leads.
Table 4-5. Electrical Leads.
Wire Number
From
To
A1W30
DS1-OUT
W4-6 (N)
A1W31
DS1-CTR
S1-LN1
A1W32
DS2-OUT
W4-6 (N)
A1W33
DS2-CTR
S2-LN1
A1W34
DS3-OUT
W4-2 (N)
A1W35
DS3-CTR
CB1-LD2
A1W36
DS4-OUT
W4-3 (N)
A1W37
DS4-CTR
CB2-LD2
A1W38
DS5-OUT
W4-4 (N)
A1W39
DS5-CTR
CB3-LD2
A1W40
DS6-OUT
W4-5 (N)
A1W41
DS6-CTR
CB4-LD2
4-24


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business